NammaWard — Civic Connected Bengaluru

Search NammaWard

Find wards, leaders, organisations and news

Government

Formulate Plan to Prevent Waterlogging on Bannerghatta Road: Maheshwar Rao

Chief Commissioner Maheshwar Rao has directed officials to prepare a comprehensive plan to permanently address recurring waterlogging on Bannerghatta Road.

Namma Ward Editorial TeamMay 31, 20260 viewsnammaward.in
Formulate Plan to Prevent Waterlogging on Bannerghatta Road: Maheshwar Rao

Chief Commissioner Maheshwar Rao has directed officials to prepare a comprehensive plan to permanently address recurring waterlogging on Bannerghatta Road. During an inspection of flood-prone locations under Bengaluru South City Corporation, he reviewed drainage, sewage, road, traffic, lake development, and infrastructure works across several key locations.

Key Details;

  • Waterlogging near Rainbow Children’s Hospital, Bannerghatta Road was reviewed.
  • Officials were instructed to prepare a permanent solution to prevent flooding caused by backflow from the rajakaluve (stormwater drain).
  • Directions were issued to completely desilt the rajakaluve and improve stormwater flow.
  • BWSSB officials were instructed to identify and stop sewage inflow into the stormwater drain near Hulimavu Metro Station.
  • Utilities obstructing water flow across drains will be relocated after installation of slabs.
  • BWSSB was directed to complete ongoing sewer pipeline works between Vega City Mall and Arekere Signal within two days.
  • Corporation authorities will begin road asphalting immediately after completion of BWSSB works.
  • A second phase of sewer works from Arekere Signal to Hulimavu Metro Station will commence thereafter.
  • At Silk Board Junction, rajakaluve capacity is being increased from 1.5 metres to 3.5 metres to reduce flooding.
  • Officials were instructed to survey and submit a report for a new drain to address waterlogging in HSR Layout.
  • Metro authorities were directed to clear the Balaji Complex site and facilitate construction of a free left turn from Bommanahalli towards BTM Layout.
  • Junction development and beautification works beneath Silk Board flyover were ordered to be completed expeditiously.
  • Development works worth ₹15 crore at Madiwala Lake are underway, including bund strengthening, walkway development, and drainage improvements.
  • During inspection of Ejipura Flyover works, officials directed completion of the Domlur-side ramp within a week and the Madiwala-side ramp within 60 days.

Topics

ArakereBannerghatta roadBWSSBEjipura FlyoverHSR LayoutHulimavuMadiwala LakeSilk Board JunctionStormwater Drainage
All Wardpulse
Ask Civic Mitra anything
C

Civic Mitra

NammaWard Civic Assistant

N
Namaskara! I'm Civic Mitra, your civic guide to Bengaluru. Ask me anything about your ward, Wardpulse, organisations, leaders, or how to report an issue.