Government
BNCC Repairs 256 Potholes Across Multiple Divisions in Three Days
Bengaluru North City Corporation (BNCC) has completed urgent pothole repair works across its limits , addressing 256 potholes over a three day period from 18–20 May 2026 to improve road safety and mobility .
Namma Ward Editorial TeamMay 25, 20260 viewsnammaward.in

Bengaluru North City Corporation (BNCC) has completed urgent pothole repair works across its limits, addressing 256 potholes over a three-day period from 18–20 May 2026 to improve road safety and mobility.



Key Details:
- Total potholes repaired: 256
- Total area covered: 2112.5 sq. m
- Work period: 18–20 May 2026
- Works carried out on arterial, sub-arterial, and ward roads
- Division-wise progress:
Byatarayanapura Division: 143 potholes (500.5 sq. m)
- Sarvagnanagar Division: 45 potholes (262 sq. m)
- Hebbal Division: 28 potholes (179 sq. m)
- Yelahanka Division: 40 potholes (1171 sq. m)
- Ward-level road inspections conducted across BNCC limits
- Damaged stretches identified and prioritised for repair
- Monsoon preparedness measures including drain and rajakaluve desilting ongoing
Topics
Bengaluru InfrastructureBengaluru North City CorporationBNCCByatarayanapuracivic worksHebbalMonsoon PreparednessPothole RepairRoad maintenanceSarvagnanagarUrban RoadsWard InspectionsYelahanka


