Additional Commissioner Inspects Development Works Across Bengaluru East City
The Additional Commissioner of Bengaluru East City Corporation , Lokhande Snehal Sudhakar , conducted inspections of ongoing ward level infrastructure works across multiple locations and directed officials to ensure quality execution , time…

The Additional Commissioner of Bengaluru East City Corporation, Lokhande Snehal Sudhakar, conducted inspections of ongoing ward-level infrastructure works across multiple locations and directed officials to ensure quality execution, timely completion, effective stormwater management, and preparedness ahead of the monsoon season.



Key Details:
- Additional Commissioner Lokhande Snehal Sudhakar inspected:
Roadside drain maintenance works
- Road development projects
- Asphalting works
- CC (Concrete Cement) road construction works
- Vinayaka Layout
Reviewed ongoing roadside drain development works.
- Directed officials to:
Repair damaged drain slabs immediately.
- Construct required weep holes for smooth rainwater flow.
- Improve surrounding drainage systems to ensure uninterrupted stormwater movement.
- Sir M. Visvesvaraya Layout
Inspected roadside drain, CC road, and asphalting works.
- Directed officials to complete pending works before the monsoon intensifies.
- Emphasized the importance of maintaining safe public movement during the rainy season.
- Bhovi Colony
Reviewed roads in poor condition.
- Instructed officials to coordinate with the Bengaluru Water Supply and Sewerage Board (BWSSB) to complete:
Drinking water pipeline works.
- Underground drainage pipeline works.
- Directed immediate commencement of concrete road construction after utility works are completed.
- FCI Godown Road and Railway Parallel Road
Directed installation of cobblestones on footpaths for pedestrian safety.
- Ordered construction of tree basins for roadside trees.
- Instructed officials to prevent leachate accumulation at waste collection vehicle parking locations.
- Directed comprehensive de-silting of roadside drains to improve rainwater flow.
- Platform Road
Reviewed road works currently in the initial stage.
- Directed officials to maintain engineering standards and ensure quality execution.
- L L Enclave
Noted that roadside drain works have been completed.
- Directed officials to prioritize pending asphalting works to improve road conditions and public convenience.
Monsoon Preparedness
- Directed officials to undertake preventive measures to avoid inconvenience during the monsoon.
- Emphasized:
Smooth rainwater flow through roadside drains.
- Expedited completion of road infrastructure works.
- Reduction of waterlogging risks and enhancement of public safety.


